Rig, dropped objects and camp inspection

Rig, dropped objects and camp inspection

Offshore drilling rig

Client: Drilling rig contractor

Asset type: Drilling rig

Location: Australia

Our client required a rig inspection to be completed at short notice as it was required urgently by the operator. 

Due to the rig being required at short notice and the fact that it had been stacked for a short period, it was a challenging process to ensure that all parties worked together to ensure compliance in the shortest possible timeframe. This required our team to visit the site a number of times to reinspect the rig and ensure compliance. It also required our technical and operations staff to manage the process with the operator and the client.

Results: The rig was mobilised to the field in a short timeframe whilst meeting regulatory, operator and client requirements.

Working towards a brighter future